Project Overview: (Scope of Work)

As the main contractor, EDECS led the infrastructure construction of the El Badrasheen Bridge project in Egypt, spanning a 100-meter-long, 60-meter-wide bridge with 6 lanes. This project involved constructing 43-meter-wide bridge 4 kilometres across the top of the ring road. The initiative was integrated into the broader national road project, particularly the middle ring spanning 147 kilometres, aimed at redistributing traffic loads from Greater Cairo and enhancing connectivity between key road networks.

Project Details:

Sector:
Infrastructure
Location:
Cairo ,Egypt
Name Of Client:
Egyptian Government
Consultant Name:
International Consultant Engineers
Project Type:
Infrastructure Works (Bridges)

Contract Details:

Role in Contract:
Main Contractor
Contract Type:
Construction
Contract Duration:
4 Months
Start Date:
May 2020
Completion Date:
September 2020
Project Execution
Design Methodology
  • Precast Beams
El Badrasheen Bridge

Related Projects

Construction of Ain Al Sokhna Seaport Berth /Basin 2,4 and 6
01 February 2024
Construction of Ain Al Sokhna Seaport Berth /Basin 2,4 and 6
See More
Construction of multi-purpose Terminal at Al-Dekheila Seaport, Berth 100 (Quay Wall)
01 June 2024
Construction of multi-purpose Terminal at Al-Dekheila Seaport, Berth 100 (Quay Wall)
See More
Construction of Two Berths (9 & 10) at Ras Al-Khair Seaport (Design & Build Contract)
01 December 2016
Construction of Two Berths (9 & 10) at Ras Al-Khair Seaport (Design & Build Contract)
See More
Construction of Eastern Quay Wall in East Port Said
01 February 2020
Construction of Eastern Quay Wall in East Port Said
See More
Construction of 680 m multi-purpose Terminal at Damietta Seaport
01 December 2018
Construction of 680 m multi-purpose Terminal at Damietta Seaport
See More
Construction of multi-purpose Terminal at Safaga Seaport (Quay Wall)
01 December 2023
Construction of multi-purpose Terminal at Safaga Seaport (Quay Wall)
See More
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
01 February 2024
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
See More
Construction of Marassi Marina Prefabricated Aluminium Pontoons
01 September 2021
Construction of Marassi Marina Prefabricated Aluminium Pontoons
See More