Project Overview: (Scope of Work)
As the main contractor, EDECS led the infrastructure construction of the Joseph Tito Bridge Near Cairo International Airport project in Egypt to establish a crucial link between 6th of October Street and Taha Hussein Corridor, New Nozha, and Suez Bridge, optimizing traffic flow and alleviating congestion on Abdel Hamid Badawi Street, especially for commuters traveling towards Al Orouba Corridor or Ismailia Desert Road. Spanning a 1500-meter-long, 12-meter-wide bridge, it features 4 lanes.
Project Details:
Name Of Client:
Egyptian Government
Consultant Name:
ACE Moharram Bakhoum
Project Type:
Infrastructure Works (Bridges)
Contract Details:
Role in Contract:
Main Contractor
Contract Type:
Construction
Contract Duration:
2 Months
Completion Date:
September 2020