An integrated system of a high-speed electric railway network linking the whole country with a total length of 1750 km and speed of 250 Km/hr. to transport passengers, tourists, and cargo along Egypt’s Eastern and Northern coasts, Luxor and Aswan. the project aims to link the Capital with other cities The Project Comprises Three Main Lines: 1st line: Al Sokhna - Alamein 2nd line: Alexandria - Matrouh 3rd line: Hurghada – Luxor
Our scope of work location at NILE SAT zone 6th October city ,from station (149+660) to station (150+810) & from station (151+800) to station (153+140) with total length = 2490 m comprises the following: Bridgeworks, including excavation, 35,200 m of piling, retaining wall, main bridge concrete superstructure with 43,000 m3 of prestressed girders and deck slabs, and 10,000 m3 of prestressed cast in site 107 frames over summed zone. Access road construction with base and asphalt layers