Shubra Banha Bridge

Consultant: International Consultant Engineers

Project Overview:

Shubra Banha Bridge above the ring road in the direction of Banha Free Road within the third phase linking Heliopolis with the Shubra Banha to transfer traffic from the heart of Heliopolis to the agricultural road without passing through the city center in only 8 minutes.

The number of lanes: 4.
Length: 1,050 meters.
Width: 19 meters.
Project Duration: Mar. 2020 - Jul. 2020.

Facts

Project Type

Roads & Bridges

Duration

(5 months)

Project Gallery