top of page
Untitled design (18).png

Joseph Tito Bridge

Consultant: Arab Consulting Engineers (ACE).

Project Overview:

Construction of Joseph Tito Bridge to connect 6th of October Street to Taha Hussein Corridor, New Nozha, and Suez Bridge, and who is heading to Al Orouba Corridor or Ismailia Desert Road, to help in the traffic flow and avoid congestion on Abdel Hamid Badawi Street.

The number of lanes: 4.
Length: 1,500 meters.
Width: 12 meters.
Project Duration: Jul. 2020 – Sep. 2020.

Facts

Project Type

Roads & Bridges

Duration

(3 months)

Project Gallery

bottom of page