Project Overview: (Scope of Work)
EDECS leads the High-Speed Rail Viaduct endeavor in Hadayek October – Giza, erecting a state-of-the-art railway spanning 1750 kilometers, capable of reaching speeds up to 250 km/hr. The project encompasses Bridgeworks, which entail 16,000 meters of piling, extended wires for retaining wall backs, and a primary bridge structure constructed with 40,000 cubic meters of precast prestressed concrete girders and deck slab. Moreover, Track embankment works involve excavation, backfilling, laying base layers, and installing 30,000 square meters of concrete slab. Access road development includes establishing base and asphalt layers, while road and earthworks consist of excavation, reinforced panels, retaining walls, road base, and two layers of asphalt, as well as the installation of traffic signs, curbs, and barriers.
Project Details:
Name Of Client:
Ministry of Transportation & Public Authority for Roads and Bridges
Consultant Name:
SYSTRA & SIMENS
Project Type:
Infrastructure Works (Bridges-Railway)
Contract Details:
Role in Contract:
Main Contractor
Contract Type:
Design and Build Contract
Contract Duration:
31 Months