Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
2021

Project Overview: (Scope of Work)

The Construction of Control Gates & Barrages of Bahr Al-Baqar Drain project in Egypt, led by EDECS, entails the construction of 3 wastewater regulating penstock stations designed to manage a flow of 5 million m³/day. These stations, featuring double steel gates and maintenance cranes, are strategically located along the Bahr Al-Baqar Drain. Components include the Cross Regulator Penstock station on the old Drain 7,500 m3 of reinforced concrete for 7 vents, the Intake Regulator Penstock station 3,500 m3 of reinforced concrete for 4 vents, and the Cross Regulator Penstock station with a weir on the New Drain 6,200 m3 of reinforced concrete for 5 vents.

Project Details:

Sector:
Infrastructure
Location:
Suez ,Egypt
Name Of Client:
Ministry of Water Resources and Irrigation
Consultant Name:
ENOIA Utilities Consulting Engineers and ACE Moharram-Bakhoum
Project Type:
Water Irrigation

Contract Details:

Role in Contract:
Main Contractor
Contract Type:
Construction
Contract Duration:
12 Months
Start Date:
January 2020
Completion Date:
January 2021
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain

Related Projects

Infrastructure Works: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria
01 June 2023
Infrastructure Works: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria
See More
Jeddah South Container Terminal Works - Stage 3B
01 June 2024
Jeddah South Container Terminal Works - Stage 3B
See More
Suez Canal Container Terminal
01 October 2024
Suez Canal Container Terminal
See More
Construction of 680 m multi-purpose Terminal at Damietta Seaport
01 December 2018
Construction of 680 m multi-purpose Terminal at Damietta Seaport
See More
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
01 February 2024
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
See More
Al-Fayrouz Fish Farms, East of Port Said
01 March 2021
Al-Fayrouz Fish Farms, East of Port Said
See More
Ahl Misr Walkway Nile River – Cairo
01 July 2021
Ahl Misr Walkway Nile River – Cairo
See More
LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo
01 February 2024
LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo
See More