Consultant: Saad Consulting Engineers.

Project Overview:

The Suez bridge serves the traffic heading from Midan Bin Sinder to Al-Abbasiya Square to reduce congestion on Al-Khalifa Al-Mamoun Street and Salah Salem Street.

The number of lanes: 4.
Length: 560 meters.
Width: 15.8 meters.
Project Duration: Jul. 2020 – Sep. 2020.

Facts

Project Type

Roads & Bridges

Duration

(3 months)