Project Overview:

We have constructed a bridge to cross the top of the ring road at 4 km with a width of 43 meters within the national project for roads (the middle ring with a length of 147 km) to transfer traffic densities from Greater Cairo and connect the main roads.

The number of lanes: 6.
Length: 100 meters.
Width: 60 meters.
Project Duration: May 2020 – Sep. 2020.

Facts

Project Type

Roads & Bridges

Duration

(4 months)