top of page
EDECS WEB PICS 2000X300014.jpg

Abu El Nomros Bridge

Owner: Ministry of Transport “Roads & Bridges Authority”.

Consultant: International Construction Engineers.

Project Overview:

We undertake the construction of a bridge at the top of the Abu El Nomros crossing, divided into two parts, the first east of the railway, with (2) exits and (1) at the Cairo-Aswan road and the second west of the railway.

The number of lanes: 4.
Length: 1530 meters.
Width: 90 meters.
Project Duration: Nov. 2021 - Jul. 2022.

Facts

Owner

Ministry of Transport “Roads & Bridges Authority”

Project Type

Roads & Bridges

Duration

(9 months)

Project Gallery

bottom of page