Shore Protection Works
At East Of El Gamil Airport
in Port-Said City

Owner: The General Authority for Shores Protection.

​

Our Scope of Works:


Construction of 14 Groins distributed along the beach and extended inside the sea with varying lengths. The works include the following:

​

  • Supply and installation of geotextiles.

  • Supply and installation of rocks.

  • Supply and installation of concrete dolosse.

  • Sand backfilling of 350,000 m3

Project Duration: Mar. 2011 - Mar. 2013.

Facts

Owner

The General Authority for Shores Protection

Project Type

Ports & Marine Works

Duration

(24 months)