Al-Adabiya Terminal for Dry Bulk at Al-Adabiya Port

This project is part of the expansions of Al Adabiya Port, which overlooks the Gulf of Suez. This project aims to construct a yard with an area of ​​100,000 square meters and a berth of 650 m in length with a depth of 14 m. Thus, the annual capacity of the port will be doubled to 10 million tons.

Our Scope of Work:

EDECS work includes marine works from marine surveying works, land and sea surveys, and dredging works in quantities exceeding (330,000 m3) up to the level of 14.00 m from the sea level, and landfill works inside the sea with clean sand supplied in an amount exceeding 1 million m3, and stone protection works for slopes.

Facts

Owner

Adabiya Marine Investment Company.

Project Type

Ports & Marine works

Duration

May 2015 - Dec 2016