Project Overview
EDECS, as the main contractor, carries out extensive infrastructure works for the Bay West Valley project at Soma Bay, Red Sea – Hurghada, covering a total area of 259,000 m². The scope includes the execution of electrical networks through the installation of GRP compact substations, LV distribution boards (DB) and submain distribution boards (SMDB), earthing systems for kiosks and SMDBs, as well as medium and low voltage power cables. The works also include wet networks involving the supply and installation of sewage and water systems. In addition, the IT network scope comprises the supply and installation of UPVC conduits and IT manholes, ensuring a fully integrated and functional utility infrastructure across the project site.
Project Details:
Location:
Soma Bay - Hurghada, Egypt
Client:
Abu Soma Development Company (ASDC)
Consultant:
ACE Moharram Bakhoum
Project Type:
Infrastructure Works
Contract Details:
Role in Contract:
Main Contractor
Contract Type:
Construction
Contract Duration:
14 Months