Project Overview
EDECS, acting as the main contractor, undertook the Engineering, Procurement, and Construction of infrastructure works for the 10th of Ramadan Dry Port S.A.E across a total area of 181,000m². The project included comprehensive earthworks, the construction of paving layers, precise road marking, and the installation of electrical, sewage, slot drain, and firefighting networks, along with reefer gantries. Upon completion, the dry port will significantly enhance logistics capacity, reaching an annual handling capacity of 100,000 TEUs in Phase 1 and 575,000 TEUs in Phase 2. Key components of the scope involved the supply and installation of pipes, manholes, valves, cables, high masts, and other essential infrastructure elements, ensuring the facility meets the highest standards of efficiency and operational performance.
Project Details:
Location:
10th Of Ramadan, Egypt
Project Type:
Infrastructure & Buildings
Contract Details:
Role in Contract:
Main Contractor
Contract Type:
Design and Build Contract
Contract Duration:
20 Months