top of page

Sokhna Thermal Power Plant

Two contracts exceeding 19 million Egyptian Pounds (€ 2.3 million) were awarded to EDECS at Sokhna Thermal Power Plant Project.

Two contracts exceeding 19 million Egyptian Pounds (€ 2.3 million) were awarded to EDECS at Sokhna Thermal Power Plant Project.

The first contract, worth € 1.65 million (14 million LE), included dredging more than 254,000 m3 at the intake and transport the dredged material to the on-shore dumping area. The works were completed between Aug. 2011 – Nov. 2011.

The second contract included transporting backfilling materials from the berth, by split barges, and backfilling the pipeline trenches using high accuracy GPS equipment. The contract value exceeded 5.25 million LE and works were completed between Mar. 2012 – Jul. 2012.

Facts

Owner

East Delta For Electric production company.

Project Type

Dredging Works, Ports & Marine works

Duration

Aug. 2011 – Jul. 2012

Project Gallery

bottom of page