top of page

Joseph Tito Bridge

Construction of Joseph Tito Bridge to connect 6th of October street to Taha Hussein Corridor, New Nozha and Suez bridge, and who is heading
to Al Orouba Corridor or Ismailia desert road, to help in the traffic flow and avoid congestion on Abdel Hamid Badawi street.

Number of lanes: 4

Length: 1500 meters

Width: 12 meters

Facts

Owner

Engineering Authority of Armed Force

Project Type

Roads & Bridges

Duration

Jul 2020 – Sep. 2020.

Project Gallery

bottom of page