The earthworks included excavation of 620,000m3 for an area of 79,000 m2 to depths of up to 14 m and shifting the excavated materials to the designated dumping area.

The earthworks included excavation of 620,000m3 for an area of 79,000 m2 to depths of up to 14 m and shifting the excavated materials to the designated dumping area, with productivity of 12,000 m3 per day.

Facts

Owner

ِAl Futtaim Properties

Project Type

Earth Works

Duration

Jun. 2008 - Oct. 2008