Project Overview:

Shubra Banha Bridge above the ring road in the direction of Banha Free Road within the third phase linking Heliopolis with the Shubra Banha in order to transfer traffic from the heart of Heliopolis to the agricultural road without passing through the city center, under only 8 minutes.

Number of lanes: 4
Length: 1050 meters
Width: 19 meters.