Project Overview:

Construction of 14 Groins distributed along the beach at spacing of 175 m and extended inside the sea with varying lengths from 60 m to 120 m. The works include the following :

  • Supply and install of 36,000 m2 geotextile.
  • Supply and install of 91,000 tons of rocks.
  • Supply and install of 1,900 concrete dolosse.
  • Sand backfilling of 350,000 m3