Project Overview
EDECS, as the main contractor, is executing Phase 4 of the Electric Train Project implemented by the Ministry of Transport and the National Authority for Tunnels, in cooperation with Chinese CREC–AVIC companies. The electric train alignment runs parallel to the Cairo–Ismailia road, reaching the International Medical Center, then branching north toward 10th of Ramadan City and south toward the New Administrative Capital, with integration into the Cairo Metro network at Adly Mansour Station. This phase comprises five stations over a total length of 16 km, with operating speeds of up to 120 km/h and a planned capacity of 350,000 passengers per day. The scope of works includes the construction of a 320 m Light Rail Transit viaduct and the installation of 1,600 m of deep foundation piles. It also covers the execution of the main bridge concrete structure, including foundations, and columns, in addition to 1,200 m³ of precast prestressed concrete incorporating bearing and expansion joints, ensuring structural stability and performance of the system.
Project Details:
Location:
10th Of Ramadan, Egypt
Client:
Ministry of Transportation & The National Authority of Tunnels
Consultant:
Khatib & Alami
Project Type:
Infrastructure Works (Bridges-Railway)
Contract Details:
Role in Contract:
Main Contractor
Contract Type:
Construction
Contract Duration:
18 Months