Project Overview
At EDECS, we take pride in delivering complex marine and land development works through integrated engineering solutions, as the main contractor. This project involves dredging 21,000 m³ of seabed using barges and excavators, including excavation, loading, transportation, and disposal of materials, with silt curtains installed to ensure environmental protection. The scope also included the construction of a 1,000-meter-long breakwater, comprising geotextile layers, quarry run, secondary armor, and primary rock armor. In addition, Plot 1 was reclaimed with approximately 10 million m³ of fill placed in layers to an average depth of 8 meters. Extensive soil improvement works are also carried out across 1.6 million m², utilizing dynamic compaction to a depth of 5 meters and rapid impact compaction to a depth of 3 meters, ensuring ground stability and readiness for future development
Project Details:
Location:
Ras Al-Khair, Saudi Arabia
Name Of Client:
Royal commission for Jubail & Yanbu
Consultant Name:
Fahd Abddulah & Partners Engineering Consultant (FAEC) & AYESA
Project Type:
Reclamation and Soil Improvement and breakwater with dredging
Contract Details:
Role in Contract:
Main Contractor
Contract Type:
Construction
Contract Duration:
36 Months