Project Overview
EDECS, as the main contractor, is undertaking the Engineering, Procurement, and Construction (EPC) of Phase 1A civil works for El Dekheila Containers Terminals S.A.E. at Dekheila Port, Egypt. The project aims to enhance port infrastructure and increase container handling capacity, supporting Egypt’s role as a regional logistics hub. The scope of works includes the construction of approximately 58.5 hectares of container yard with heavy-duty pavements serving a 1,200-meter-long berth with a depth of 18 meters. The terminal is designed to handle up to 1,610,000 TEUs annually and will be equipped with advanced systems including quay cranes (STS), electrical Rubber Tyred Gantry cranes (eRTG), and Autonomous Truck systems (ATTs). The works also include container stacking areas, reefer facilities, eRTG runways, rail depot, and parking areas, in addition to stacking bays with plinth beams and gravel beds, as well as steel structures and foundation pads for crane systems. The buildings scope comprises electrical substations, gate complex, administrative and security buildings, customs facilities, and workshops. In addition, the project includes the installation of electrical supply and distribution systems, area lighting, and ICT networks such as CCTV and communication systems, along with all associated infrastructure including stormwater drainage, sewerage, water supply, firefighting systems, and site utilities.
Project Details:
Name Of Client:
El Dekheila Containers Terminals S.A.E. Company
Project Type:
Infrastructure & Buildings
Contract Details:
Role in Contract:
Main Contractor
Contract Duration:
18 Months