High-Speed Rail (HSR)

HSR Station

Owner: Ministry of Transportation - The National Authority of Tunnels.

Consultant: Systra Group.

(Cairo - Al Fayoum) Bridge

Owner: Ministry of Transportation - Public Authority for Roads and Bridges.

Consultant: Moharram Bakhoum (ACE).

The Railway Track Bridge

Owner: Ministry of Transportation - Public Authority for Roads and Bridges.

Consultant: Systra Group.

Project Overview:

An integrated system of a high-speed electric railway network linking the whole country with a total length of 1750 km and speed of 250 Km/hr. to transport passengers, tourists, and cargo along Egypt’s Eastern, Northern coasts, Luxor, and Aswan, the project aims to link the country with neighbors’ countries as well, will be implemented by Siemens along with Egyptian construction companies.

Our Scope of Works:
 

  1. Hadayek October High Speed ​​Rail Station.

  2. A Cross Bridge for (Cairo- Al Fayoum) road intersection with length 1.2 km.

  3. The railway track bridge with length 1.35 km.

  4. The train track with length 4 km.

The Project Comprises Three Main Lines:
 

1st line: Sokhna – Matrouh.
2nd line: 6 of October - Aswan.
3rd line: Qenna – Safaga.

Project Duration: Oct. 2021 - Oct. 2023.

Facts

Owner

National Authority of Tunnels “NAT” & Ministry of Transportation

Project Type

Railway Works

Duration

(24 months)