EDECS WEB PICS 2000X300019.jpg

Hassab Allah El Kafrawy Bridge

Owner: The Engineering Authority of the Armed Forces.

Consultant: ACE Arab Consulting Engineers "Moharram.Bakhoum"

Project Overview:

We undertake the construction of Maadi Bridge 1 in the Hassaballah El Kafrawy axis connects Autostrad Road with Ring Road to help in the traffic flow and avoid congestion.

The number of lanes: 6.
Length: 420 meters.
Width: 22 meters.
Project Duration: Oct. 2021 - Jan. 2022.

Facts

Owner

The Engineering Authority of the Armed Forces

Project Type

Roads & Bridges

Duration

(4 months)

Project Gallery

Videos