El Marazik Bridge

Owner: Ministry of Transport “Roads & Bridges Authority”.

Consultant: International Construction Engineers.

Project Overview:

We undertake the construction of a bridge at the top of the Al thalaga in Maraziq crossing. The bridge is divided into two parts. The first is an entrance for those coming from Giza to the top of Dahshur-Saqqara Road, and the second is an exit for those coming from Dahshur-Saqqara Road to Cairo-Aswan Agricultural Road in the direction of Assiut.

The number of lanes: 4.
Length: 1323 meters.
Width: 10 meters.
Project Duration: Nov. 2021 - Apr. 2022.

Facts

Owner

Ministry of Transport “Roads & Bridges Authority”

Project Type

Roads & Bridges

Duration

(6 months)