Dredging & Pipeline Backfilling Works for The Intake in Sokhna Thermal Power Plant.jpg

Dredging & Pipeline Backfilling Works for The Intake in Sokhna Thermal Power Plant

Owner: East Delta for Electric production co.

Main Contractor: Orascom-Besix JV.

Our Scope of Works:

Contract No. 1

​Included dredging at the intake and transporting the dredged material to the on-shore dumping area.

Contract No. 2

​Included transporting backfilling materials from the berth, by split barges, and backfilling the pipeline trenches using high accuracy GPS equipment.

Project Duration: Aug. 2011 - Aug. 2012.

Facts

Owner

East Delta for Electric production co

Project Type

Dredging Works, Ports & Marine Works

Duration

(12 months)